Our team assisted the Town of Middletown, Delaware with the planning, design, permitting and construction of a significant upgrade to their wastewater treatment plant. Because of growth concerns, the town needed to increase treatment plant capacity. In addition, there was a desire to improve effluent water quality to take advantage of new disposal method options. The project included the installation of a three basin 3.75 MGD Sequencing Batch Reactor (SBR), additional filtration capacity, a new biosolids dewatering system, and redundant electrical service upgrades. Verdantas is now helping the Town implement a plan to increase disposal capacity using Rapid Infiltration Basins.