Verdantas performed the Civil Engineering and Facility Site Design for a Compressed Natural Gas (CNG) Facility expansion in Pennsylvania, which involved site layout expansion, electrical upgrades, additional CNG compression, and CNG dispenser bays.
The project specifically required:
- Existing Conditions Survey
- Environmental Resource Delineation
- Civil/Site Design
- NPDES Permitting
- Land Development Approval
- Township Highway Occupancy Permit
- Integrating CNG compressor packages into existing facility
- Integrating CNG vendor equipment and prefab buildings
- Structural equipment and building foundations
- Pipe racks and supports
- Electrical
- Instrument and Control
- Fire & Gas Detection
To complete this work, our team developed 3D Civil site designs and preliminary facility layouts required for permitting and approvals, integrated mechanical, electrical, and structural 3D facility design models, which included both equipment and vendor models.
Upon project completion, this site expansion saw noteworthy upgrades including 5000 PSI pressure system piping designs and specifications, multiple 400HP Electric Drive CNG Compressors, and Chiller Additions.